Work Missions
- Renato Ventura Bayan Henriques (November 14, 2016 to November 17, 2016)
- Participation in the BRAGECRIM Annual Meeting
- Participation in technical project meetings
- Alignment meeting of the project
- Danúbia Espíndola (December 1, 2015 to December 15, 2015)
- Discussion and preparation of publications (e.g. Computers in Industry about I2MS2C integration layer)
- Agreement about the SOA based integration system between thematic areas 4 and 5 as well as between thematic areas 1 and 4
- Investigation of the requirements about semantics to extract expert knowledge from maitnence personnel; a human machine interaction proposal
- Bernd Hellingrath (March 10, 2015 to March 15, 2015)
- Participation in kick-off workshop for project phase 2
- Visit of Brazilian partner universities
- Enzo Morosini Frazzon (November 11, 2014 to December 5, 2014)
- Participation in the BRAGECRIM Annual Meeting
- Participation in technical project meetings
- Alignment of and work on project interfaces between thematic areas
- Bernd Hellingrath (July 25, 2014 to August 3, 2014)
- Attendance and project presentation at INDIN conference
- Visit of Brazilian partner universities
- Participation in technical project meetings
- Bernd Hellingrath (Spetember 30, 2013 to October 2, 2013)
- Participation in the BRAGECRIM Annual Meeting
- Participation in technical project meetings
- Enzo Morosini Frazzon (June 26, 2013 to June 18, 2013)
- Agreement about the interfaces between thematic area 2 and 3 as well as between thematic area 1 and 3
- Final alignment of study mission
- Joint work and paper writing
- Initiate preparation for the BRAGECRIM Annual Meeting
- Renato Ventura Bayan Henriques (June 21, 2013 to June 31, 2013)
- Watchdog Agent in the scope of the project
- Project interfaces allignment
- Definition of data exchange among IMS and spare parts supply chain participants
- Paper idea
- Bernd Hellingrath (May 20, 2013 to May 29, 2013)
- Participation at IMS conference and a project workshop
- Nelson Duarte Filho (May 5, 2013 to May 14, 2013)
- Joint work on WP1 and WP4
- WCEAM2013 paper
- Detailing FURG/WWU interface: TOOGLE-IMS
- Bernd Hellingrath (November, 2012)
- Kick-off meeting, start of project
- Carlos Eduardo Pereira (October 7, 2012 to October 17, 2012)
- Preparation for the BRAGECRIM Annual Meeting
- Follow up the execution of WPs; planning of missions
- Technical visits to potential industry partners.
Study Missions
- Rodrigo Wolff Porto (December 9, 2016 to November 30, 2017)
- Work on modeling and optimization of inductive links for powering movable sensor nodes
- Participation at the 2017 IEEE International Instrumentation and Measurement Technology Conference
- Participation at the 17th IEEE International Conference on Environment and Electrical Engineering
- Charles Steinmetz (December 6, 2016 to October 26, 2017)
- Work on the integration layer using IoT concepts and an extension of the already developed ontology
- Participation in the 15th International Conference on Industrial Informatics (INDIN)
- Discussion of future work on model-driven development for industrial systems with IoT architectures
- Carolin Wagner (November 6, 2016 to November 21, 2016)
- Participation in the Symposium on Telematics Application
- Discussion and work on project interfaces
- Participation in technical project meetings
- Carolin Wagner (July 26, 2016 to August 11, 2016)
- Presentations and discussions of achieved results and future work
- Work on project interfaces
- Discussion and preparation of publications
- Investigation of methods to include expert knowledge into intelligent maintenance systems
- Philipp Saalmann (October 11, 2015 to October 29, 2015)
- Participation in the BRAGECRIM Annual Meeting
- Visit of Brazilian partner universities
- Participation in technical project meetings
- Alignment of and work on project interfaces between thematic areas
- Finalization of (join) project publications
- Greyce Schroeder (August 20, 2015 to December 20, 2015)
- Work on the conceptual model of a twin model for intelligent machines
- Research how to extract expert knowledge from the maintenance personnel and how this can benefit forecasting in SPSC
- Research visulaization interfaces for data collection
- Lucas Souza Silva (July 7, 2015 to March 3, 2016)
- Research on simulation procedures
- Elaboration of a simulation model that allows for the evaluation of the performance of concepts, methods, and solutions which are adopted in other areas of the I2MS2C project
- Research on collaborative planning concepts to support the development of a heterarchical model to optimize spare parts supply chain planning on an operational level
- Matheus Pires (June 8, 2015 to February 27, 2016)
- Reevaluation of the hierarchical integrated planning model supporting spare parts supply chain planning on an operational level
- Development of a heterarchical model to optimize the spare parts supply chain planning on an operational level, using collaborative planning concepts
- Designing communication standards between tactical and operational levels for hierarchical collaborative planning models
- Research efficient solving approaches for mathematical optimization models
- Philipp Saalmann and Carolin Wagner (March 10, 2015 to March 27, 2015)
- Participation in kick-off workshop for project phase 2
- Visit of Brazilian partner universities
- Participation in technical project meetings
- Alignment of and work on project interfaces between thematic areas
- Planning of future work and study missions
- Philipp Saalmann (July 25, 2014 to August 13, 2014)
- Attendance and project presentation at INDIN conference
- Visit of Brazilian partner universities
- Participation in technical project meetings
- Alignment of and work on project interfaces between thematic areas
- Technical visit to potential industry partner
- Fabricio da Silva Stein (February 5, 2014 to September 09, 2014)
- Support on IMS prognostic tool development and test
- Development of a study case: Gyrum (rotary internal combustion engine) IMS
- Philipp Saalmann (March 20, 2014 to April 13, 2014)
- Visit of Brazilian partner universities
- Participation in technical project meetings
- Definition of project interfaces between thematic areas
- Technical visit to potential industry partner
- Marcos Zuccolotto (February 01, 2014 to May 31, 2014)
- Development and validation of IMS prognostic tool
- Development and validation the communication layer
- Danúbia Espíndola (September 01, 2013 to December 01, 2013)
- Participation in seminars and technical meetings;
- Definition of visualization interface for data collection and data provision
- Investigation requirements for webservice-based communication structure
- André Albrecht Lopes (July 22, 2013 to March 13, 2014)
- Research on simulation procedures
- Elaboration of simulation models
- Creation of a method to evaluate and compare different simulation models
- Thiago Michelin (July 1, 2013 to October 31, 2013)
- Work on the specific use case of embedded systems for the automotive field
- Definiton of messages to be exchanged between embedded maintenance system and spare parts supply chain using the FlexRay protocol
- Evaluation of the impact of incoming messages from the spare parts supply chain on the automotive embedded systems
- Thiago Regal da Silva (July 1, 2013 to October 31, 2013)
- Conceptual modelling of the integration between IMS and spare parts supply chain
- Ontology proposal describing classes, entities, individuals and relations which are relevant for integration
- Deriving an enterprise architecture proposal from the conceptual model
- Eduardo Israel (June 1, 2013 to February 28, 2014)
- Definition of the scope of the operational level inside spare parts supply chain planning
- Determination of the relation between the operational and tactical level in spare parts supply chain planning
- Tailoration of operational supply chain planning and scheduling methods for the integration of spare parts supply chains and IMS
- Ann-Kristin Cordes (February 24, 2013 to March 16, 2013)
- Participation at NAVCOMP;
- Participation in seminars and technical meetings; definition of project interfaces (WP1 and WP4; WP3 and WP8);
- Technical visit to potential industry partners, visit of all Brazilian partner universities